Seabreeze Drive Sewer Project

The City of Tarpon Springs has requested that King Engineering Associates, Inc. (King) provide engineering design, permitting, and bidding services for the construction of the new gravity sewer system and pump station in the Seabreeze Drive area. In general, the gravity sewer system will include approximately 2,800 feet of 8-inch diameter gravity sewer main, and 11 manholes which convey raw sewage to a new wastewater pump station. The raw sewage from the pump
station will be pumped through a 4-inch pipe that will tie into the existing pipe running along Riverside Drive.